Achtung: Dies ist eine historische Web-Site. Aktuell ist https://rainer.gerhards.net/ (engl) bzw https://www.rainer-gerhards.de/ (deutsch). Alle dynamischen Funktionen, Formulare etc auf dieser Seite sind abgeschaltet.
Datenschutzerklärung Impressum

 
01.08.2017, 23:02 Uhr
Hauptmenü
|--> Infos
|--> Forum
|--> Fotos


Sprachwahl
Sprache auswählen:




Online
Aktuell 1 Gast und 0 registrierte Benutzer online.

Anmeldung

Anmeldung




 




Cassini Significant Events for 09/28/06 - 10/04/06

Written by Rainer Gerhards on 2006-10-06 at 19:00.

Cassini Significant Events
for 09/28/06 - 10/04/06

The most recent spacecraft telemetry was acquired Wednesday, October 4, from the Canberra tracking stations. The Cassini spacecraft is in an excellent state of health and is operating normally. Information on the present position and speed of the Cassini spacecraft may be found on the "Present Position" web page located at http://saturn.jpl.nasa.gov/operations/present-position.cfm .

Thursday, September 28 (DOY 271):

The Huygens descent movies are now available in a multilingual version thanks to a collaborative effort between Europlanet and the European Space Agency (ESA) Communications office. Currently the CDROM contains six languages: English, French, German, Greek, Polish, Finnish. Other languages are being added and are downloaded from a web server when the CDROM is started on a computer connected to the Internet. For more information go to the ESA website.

The S24 sequence leads met to discuss implementation of a double playback of RADAR data from the Titan 19 encounter. The flyby will occur on October 9 with playback scheduled for October 10. The files have been built to support this request, and will be uplinked to the spacecraft on October 3.

The first two flight software files for the Ion and Neutral Mass Spectrometer (INMS) were uplinked as scheduled to the spacecraft today, but due to the accidental severing of the fiber optic line between JPL and Goldstone, the remainder had to wait for the backup window on Friday. The procedure has been successfully completed and all files are currently onboard.

Friday, September 29 (DOY 272):

The Aftermarket Process for the S29 sequence covering orbits 42 through 44 began today. This 5-week process will address proposed changes that require re-integration of the segments contained in the S29 sequence.

The input files for the official port for S27 were delivered today as part of the Science Operations Plan Update Process. The process concludes next week and the final development process for this sequence will begin on October 16.

Saturday, September 30 (DOY 273):

A new Cassini photo release is available on the public website. It showcases close-ups of the Saturn moon Helene. Cassini passed within 50,000 kilometers of Helene when these images were acquired. For more information link to: http://saturn.jpl.nasa.gov/multimedia/images/image-details.cfm?imageID=2273

Saturn Observation Campaign (SOC) members presented a two-year anniversary talk at the 21st annual Whirlpool Star Party in Birr, Ireland. Over 150 amateur astronomers, representing 18 amateur astronomy clubs throughout Ireland attended. Three Irish SOC members were in attendance, and several individuals expressed interest in joining the Saturn Observation Campaign. Cassini outreach material was distributed to all.

Sunday, October 1 (DOY 274):

Orbit Trim Maneuver (OTM) #75 was uplinked to the spacecraft on Saturday and executed on Sunday. This is the apoapsis maneuver setting up for the Titan 19 encounter on October 9. The main engine burn began at 3:29 AM PDT. Telemetry immediately after the maneuver showed the burn duration was 40.25 seconds, imparting a delta-V of approximately 6.46m/s, as planned. All subsystems reported nominal performance after the maneuver.

Monday, October 2 (DOY 275):

The S25 sequence lead reported that the STEREO launch has been confirmed for October 25. That is just three days after the start of execution for the S25 background sequence and will directly and indirectly impact DSN support for Cassini. Team members are working closely with the DSN scheduler and representatives from STEREO to reduce the impact as much as possible. The DSN passes requested for the entire sequence have been reviewed by the Navigation, Spacecraft, and Science Planning teams in order to assess the relative importance of each pass. S25 begins executing on Sunday, October 22.

Tuesday, October 3 (DOY 276):

The Solid State Power Switch (SSPS) on the SRU-A decontamination heater unexpectedly changed state from OFF to tripped at 276T16:27:02 SCET, October 3, 2006, causing the SSPS trip count to be increased by 1. This event had no effect on spacecraft operations, as this heater is normally unpowered. This was one of the SSPS monitored by the on-board CDS autonomous fault protection algorithm, so was set back from tripped to OFF without ground intervention. The CDS table entry will be cleared and a memory readout will be performed in the next reporting period. This is now the 19th such trip and the fifth this year. These trips, attributed to Galactic Cosmic Rays, are expected to occur at a rate of about two per year since launch about nine years ago.

Wednesday, October 4 (DOY 277):

The Encounter Strategy Meeting for T19 - T20 was held today. This meeting covered the period from October 9 through October 25, Titan encounters 19 and 20, and Orbit Trim Maneuvers 77, 78 and 79.

Wrap up:

Check out the Cassini web site at http://saturn.jpl.nasa.gov for the latest press releases and images.

The Cassini-Huygens mission is a cooperative project of NASA, the European Space Agency and the Italian Spsce Agency. The Jet Propulsion Laboratory, a division of the California Institute of Technology in Pasadena, manages the Cassini-Huygens mission for NASA's Science Mission Directorate, Washington, D.C. JPL designed, developed and assembled the Cassini orbiter.

Print | Email to a friend | Hits: 2185
Nur angemeldete Benutzer dürfen Kommentare verfassen. Zur Registrierung/Anmeldung


:: RSS Feed: ::
Page created in 0.221937894821 seconds.

Ferientips - das Urlaubsweb - Jan Gerhards - Ulrike Gerhards - Ulrike Gerhards Foto Site